Hoblers Bridge Road

Bathroom Renovation
Square Meters
7.6m2
Cost To Complete
$34,200
Project length
16 working days
BEFORE
Hoblers Bridge before photo 1
After
BEFORE
Hoblers Bridge before photo 2
After
BEFORE
Hoblers Bridge before photo 3
After
BEFORE
Hoblers Bridge before photo 4
After
Bathroom Renovation
Embarking on a journey from the dated aesthetic of a 1970s bathroom to the sleek embrace of modern design, this transformation breathes new life into a once-time-capsule space. Outdated features removed to make way for a clean, minimalist palette, with crisp whites and subtle grays transforming the atmosphere from retro to contemporary chic. The best change for this project was the relocation of the toilet, tucked around the corner, introducing a sense of openness and fluidity to the room.
Strategic lighting upgrades enhance the modern ambiance, with an LED skylight providing a bright, energy-efficient glow. A seamless transition from the nostalgic charm of the 1970s to the cutting-edge comforts of the present. This rejuvenated bathroom is a testament to the transformative power of modern design, offering a stylish sanctuary that effortlessly bridges the gap between decades.
FAVOURITE FEATURES:
After photos (5)